Hi,
I have and education center that is running GHOST deployment for 10 years.
It's time for some change. I've installed Windows server 2012, WDS and GHOST Server on one hyper-V machine
When i deploy through ghost it finishes with an image of 25 GB on 10 PC.s in rough 1h (multicast)
When i try the same with WDS it finishes in 8-10h (multicast).
IGMP is enabled, switches are set for multicast.
Is there anything that i can do?